Tables 4a. Parameters of the Linear Regression between the monthly (or annual by month) temperature data and the elevation at which the station was located.

Notes: 2=includes SF and SA (10 data points); 3=includes SA and excludes SF(9 data points); 4=excludes SA and SF(8 data points)
(Parameters as defined by SigmaStat V.1.0 for Windows: R, Rsqr, PRESS, power, Std. Error of Estimate, Std Error of Constant, and Std. Error of Coefficient.)

(Visit soil temperature regressions -Table 4b-)

annual, Feb 1997, Mar 1997, April 1997, May 1997, Jun 1997, Jul 1997, Aug 1997, Sep 1997, Oct 1997, Nov 1997, Dec 1997, Jan 1997

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
annual (a)2 air=26.5-(0.00561*elevation) 0.955 0.912 5.37 0.9988 0.6216 0.407045 0.000617
(9)3 air = 26.9-(0.00618*elevation) 0.972 0.946 3.27 0.9995 0.5052 0.388203 0.000560
(8)4 air = 26.4-(0.00558*elevation) 0.969 0.940 1.92 0.9964 0.4338 0.423678 0.000578

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Feb 1997 (a)2 T=23.8-(0.00593*elevation) 0.963 0.927 4.74 0.9995 0.5916 0.387429 0.000588
(9)3 T=24.2-(0.00636*elevation) 0.971 0.942 3.84 0.9993 0.5366 0.41253 0.000595
(8)4 T=23.6-(0.00566*elevation) 0.971 0.942 2.04 0.997 0.4296 0.419549 0.000572

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Mar 1997 (a)2 T=24.3-(0.00534*elevation) 0.941 0.885 6.26 0.996 0.6869 0.449851 0.000682
(9)3 T=24.8-(0.00591*elevation) 0.96 0.921 4.23 0.9974 0.5901 0.453459 0.000654
(8)4 T=24.3-(0.00528*elevation) 0.95 0.902 3.01 0.9834 0.53339 0.521433 0.000711

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Apr 1997 (a)2 T=25.9-(0.00602*elevation) 0.954 0.91 6.29 0.9987 0.6727 0.440504 0.000668
(9)3 T=26.6-(0.00678*elevation) 0.984 0.968 1.98 1 0.4190 0.321937 0.000464
(8)4 T=26.5-(0.00670*elevation) 0.977 0.954 2.21 0.9987 0.4506 0.440088 0.0006

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
May 1997 (a)2 T=26.9-(0.00601*elevation) 0.957 0.915 6.37 0.999 0.6508 0.426184 0.000646
(9)3 T=27.4-(0.00667*elevation) 0.978 0.957 3.46 0.9998 0.4807 0.369418 0.000533
(8)4 T=26.7-(0.00588*elevation) 0.988 0.976 0.93 0.9999 0.2849 0.278236 0.000379

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Jun 1997 (a)2 T=28.4-(0.00619*elevation) 0.949 0.902 7.90 0.9980 0.7283 0.476925 0.000723
(9)3 T=29.0-(0.00702*elevation) 0.983 0.966 2.81 0.9999 0.4512 0.346745 0.000500
(8)4 T=28.6-(0.00643*elevation) 0.983 0.967 1.42 0.9997 0.3631 0.354638 0.000484

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Jul 1997 (a)2 T=28.3-(0.00639*elevation) 0.954 0.910 7.09 0.9987 0.7139 0.467521 0.000709
(9)3 T=28.8-(0.00703*elevation) 0.971 0.944 4.47 0.9994 0.5850 0.449493 0.000648
(8)4 T=28.2-(0.00630*elevation) 0.97 0.940 2.45 0.9966 0.4869 0.475548 0.000649

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Aug 1997 (a)2 T=28.3-(0.00590*elevation) 0.953 0.909 3.46 0.9865 0.5728 0.559490 0.000763
(9)3 T=28.6-(0.00631*elevation) 0.967 0.934 3.78 0.9988 0.5706 0.438445 0.000633
(8)4 T=28.0-(0.00553*elevation) 0.931 0.866 8.15 0.9927 0.7735 0.506520 0.000768

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Sep 1997 (a)2 T=27.5-(0.00508*elevation) 0.922 0.850 7.47 0.98885 0.7616 0.498739 0.000756
(9)3 T=27.9-(0.00565*elevation) 0.942 0.887 5.55 0.9902 0.6885 0.529050 0.000763
(8)4 T=27.4-(0.00504*elevation) 0.919 0.844 4.50 0.9427 0.6631 0.647627 0.000883

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Oct 1997 (a)2 T=26.5-(0.00468*elevation) 0.929 0.862 5.61 0.9918 0.6663 0.436303 0.000662
(9)3 T=26.9-(0.00514*elevation) 0.943 0.889 4.39 0.9908 0.6201 0.476467 0.000687
(8)4 T=26.5-(0.00466*elevation) 0.918 0.844 3.87 0.942 0.6152 0.600838 0.000819

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Nov 1997 (a)2 T=25.8-(0.00506*elevation) 0.961 0.923 3.61 0.9993 0.5219 0.341773 0.000518
(9)3 T=26.0-(0.00537*elevation) 0.964 0.928 3.34 0.9983 0.5079 0.390288 0.000563
(8)4 T=25.5-(0.00472*elevation) 0.961 0.923 1.77 0.992 0.4188 0.409014 0.000558

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Dec 1997 (a)2 T=25.6-(0.00520*elevation) 0.943 0.889 5.44 0.9965 0.6550 0.428950 0.000651
(9)3 T=25.7-(0.00536*elevation) 0.936 0.876 5.91 0.9965 0.6886 0.529166 0.000763
(8)4 T=25.1-(0.00461*elevation) 0.917 0.841 3.77 0.9391 0.6148 0.600506 0.000819

Go to the top

AIR Curve R Rsqr PRESS Power alpha=0.05 Std. Err of estimate Std. Err
Intercept
Std. Err Coefficient
Jan 1998 (a)2 T=24.8-(0.00537*elevation) 0.949 0.901 5.24 0.9979 0.6344 0.415467 0.000630
(9)3 T=25.1-(0.00566*elevation) 0.949 0.901 5.21 0.9939 0.6408 0.492400 0.000710
(8)4 T=24.4-(0.00490*elevation) 0.939 0.882 2.95 0.9718 0.5498 0.536980 0.000732

Go to the top