Research Site Official Title

Bisley Study Area coarse woody debris environment transects site

Area

Bisley Research Area

Datum

NAD_1927_DEF_1976_UTM_Zone_18N

Location

Javascript is required to view this map.

Location Description

Two plots (each 8 x 16 m) were established at each of the Icacos and Bisley study sites in 1989 allowing us to make comparisons of decomposition among riparian  and upland plots within watersheds and between watersheds. Similar plots were established in 1990 (riparian and upland, Bisley and Icacos). Since the Icacos upland plot (North side of stream) was only minimally disturbed (defoliated), a fifth plot, hereafter referred to as 1990 Icacos Upland Blowdown plot (data variable designated as South side), was established in an adjacent area that  was severely disturbed.